Project: Camp Reserve Castlemaine Footpath works

Client: Mount Alexander Shire Council

Due to increased usage at Camp Reserve it required for construction of new 1.5-meter footpath to ensure safety of pedestrians entering and exiting the reserve during events. Works included drainage and safety bollards to be installed along the footpath to provide a clear and safe separation for pedestrians from vehicles.